Catastrophic flooding triggered by days of relentless rainfall and mountain runoff has severed key transport links in southeastern Bangladesh, with the critical Chittagong-Cox’s Bazar highway becoming the latest thoroughfare to be submerged. As reported by the local newspaper Prothom Alo, water levels on the highway at the Pathanipul area of Chandanaish upazila reached depths of two to two-and-a-half feet on Thursday morning, severely disrupting ground travel.
The collapse of the highway infrastructure follows the suspension of rail services between Chittagong and Cox’s Bazar. That route has remained inaccessible since Tuesday, when rising floodwaters inundated railway tracks near the Muradpur area of Chittagong city.
Dohazari Highway Police Station officer-in-charge Salauddin Chowdhury confirmed that approximately 500 meters of the highway are currently under water. While long-distance buses and other vehicles are navigating the inundated stretch with extreme caution, highway patrol teams have been deployed to manage traffic flow and assist pedestrians struggling through the rising currents.
Local residents have described the conditions as treacherous, with reports of water flowing with significant intensity across the road. Some commuters, finding small public transport vehicles unable to navigate the submerged sections, have been forced to wade through waist-deep water to reach their destinations, a process described by witnesses as both slow and hazardous.
The administrative impact of the flooding is widespread, with the Chandanaish upazila administration reporting that approximately 15,000 residents across several unions and wards, including Dhopachhari, Satbaria, and Barkal, have been marooned by the rising waters since Wednesday night. Local officials stated that they are monitoring the situation closely and remain optimistic that conditions will stabilize rapidly once the persistent rainfall subsides and the flow of mountain runoff from the Bandarbans region begins to recede.